Rights-Of-Ways Management

Rebecca Foster
Engineering Tech
The City of Edina carefully manages its rights-of-ways.
Before beginning work in a right-of-way, a utility company
must first:
- Contact Engineering Technician
Rebecca Foster at 952-826-0447 to begin the
planning process. She will assist you with County section maps, as-builts of
City utilities (water, sanitary and storm sewers) and other information you
might require.
- Complete the annual registration application. All registrations must be
updated annually by Sept. 1.
- Submit the annual registration, certificate of insurance and bond to:
Engineering Tech Rebecca Foster
City of Edina Engineering Department
4801 W. 50th St.
Edina, MN 55424-1394
- City staff will process registration packets within five days and will
then contact you.
- Submit the permit application. All permit applications will require
application fee paid in full prior to the issuance of a permit.
- City staff will process the permit within three days and contact you
regarding specific requirements.
Restoration must be completed per
Section 421.07 of the Edina City Code.
Submit as-builts after completion of work. As-builts must be submitted in
hardcopy format along with an electronic version in Arcview (shape
file). These drawings must be submitted annually by Sept. 1 for all prior-year
work. As of Jan. 1, 2007, the Engineering Dept. is now receiving their
Right-of-Way permits through an online application named ROWay designed by
First Scribe. Visit
www.firstscribe.com/roway/edina.htm to register with the City
to do work within the right-of-way and submit a utility permit. You can also
view the Permit Activity Map and learn about excavations in or near your
neighborhood.
|
 |