City Code

Section 425 - Littering in the Course of Construction Work
425.01 Precaution Against Littering Required. No person,
in the course of construction work, shall permit a vehicle to enter upon any
public street, alley, sidewalk or other public place without first:
A. Having its tires and wheels cleaned so as not to
litter or soil any street, alley sidewalk or other public place; and
B. Having any material removed from the interior or
exterior of the vehicle body which might fall or be deposited upon any
street, alley, sidewalk or public place by normal movement of the vehicle in
traveling over such places.
425.02 Maintenance at Building Site.
Subd. 1 Public Places. All streets, alleys,
sidewalks or public places adjacent to any building or construction site
shall be maintained free of soil or litter caused by erosion, landslides or
general construction activities at such site.
Subd. 2 Construction Sites. All refuse generated
by demolition or construction activities shall be promptly deposited and
stored in dumpsters or containers for such purposes. Dumpsters and
containers shall be periodically serviced to prevent refuse from blowing to
other properties. Dumpsters and containers shall be removed within ten days
of the cessation of work at the building site.
425.03 Principal Responsible; Joint Responsibility.
Whenever a person is engaged in any construction or maintenance activity as a
general contractor or principal contractor, it shall be that person's
responsibility to see that none of the provisions of this Section are violated
by the agents, employees, subcontractors, or haulers of materials and supplies.
If more than one general contractor or principal contractor is involved in work
which contributes to the soiling or littering of streets, alleys, sidewalks or
other public places in the same site or area, they shall be severally and
jointly responsible for compliance with the provisions of this Section and any
penalties imposed for violations of this Section.
425.04 Clean-Up Required. If a street, alley, sidewalk or
other public place should become soiled or littered through any of the
aforementioned means, the person or persons responsible shall cause such soiling
or littering to be cleaned up not later than the end of the working day in which
such soiling or littering shall have occurred or been observed.
425.05 Enforcement by Engineer. If the person or persons
responsible for violation of this Section fail to comply with any order of the
Engineer to clean up, or fail to take such precautions declared by the Engineer
to be necessary to prevent foreign materials from being deposited on the street,
alley, sidewalk or other public place, then the Engineer may order in writing
all ingress and egress to the site or area involved to be stopped until compliance
with the order is effected.
425.06 Certain Construction Work Exempted. The above
rules shall not apply to construction work within the barricaded area of work
being done in the street or other public right-of-way pursuant to a City
excavation permit authorizing the same, or to certain emergency or other work
being performed within a barricaded area pursuant to a City contract, or under
permit issued by the City, or being performed by emergency forces, provided that
excavated material stored temporarily within the barricaded area shall not be
scattered or carried or allowed to accumulate outside of such area.
History: Ord 422 codified 197
|
 |